The Beginning

The Beginning
Our House

Monday 5 September 2011

Progress!

The outside ground level is higher than inside in this room so was quite damp but this clever membrane keeps all the
moisture out!

The membrane continues out into the hallway

The new joists and damp proofing in the living room.

Bare ceiling in living room!

We were unsure why these openings were here but we have discovered
that the left one was where the original box bed was and the right side was a pantry!
Our 2 'helpers'!  They loved hammering the plaster and helping Michael with the cementing!

Framing starts in the boys bedroom

Framing for the en-suite and bathroom

Framing in the main bedroom.  Disappointed that we are covering up the fireplace but
we would have nowhere to put the bed!

No comments:

Post a Comment