Tuesday, 14 February 2012
Latest quilt
When I'm not at Cullen I have been sewing various things for the house. The curtains for the boys room are cut out and I have eventually finished the quilt top for the downstairs bedroom! The applique took me ages, there are 64 circles, 18 flowers and 14 trees all sewn on by hand!
Latest news!
We have been busy the last few weekends getting the insulation in downstairs. It is all in and looking nice and cosy! (Although it was warmer outside than it was inside the house on Sunday!) I started to nail on the paneling we had stripped in the hallway. We also had a chat with out new neighbour at Cullen about the plans for the new extension. We are pleased to get the ball rolling there so we can hopefully get it built during the sunny summer!
My mum, dad, boys and I took a trip up today. We took up a couple of doors that we bought for between the living and dining room then had a tidy up. We took more doors and a pine kist to Drybridge for dipping then had a lovely lunch at Rockpool (Trip Advisor gives it 5/5). Boys lunch buckets were served in proper sandcastle buckets and the fish and chips are served on 'newspaper'! I really liked the paint colour in the cafe so I asked about the colour! I'll have a wee trip to Homebase tomorrow to get a sample of Green Ground for the hallway!
Travis Perkins also delivered some plasterboard today for downstairs then we loaded the cooker onto the trailer and took it to the boys school.
My mum, dad, boys and I took a trip up today. We took up a couple of doors that we bought for between the living and dining room then had a tidy up. We took more doors and a pine kist to Drybridge for dipping then had a lovely lunch at Rockpool (Trip Advisor gives it 5/5). Boys lunch buckets were served in proper sandcastle buckets and the fish and chips are served on 'newspaper'! I really liked the paint colour in the cafe so I asked about the colour! I'll have a wee trip to Homebase tomorrow to get a sample of Green Ground for the hallway!
Travis Perkins also delivered some plasterboard today for downstairs then we loaded the cooker onto the trailer and took it to the boys school.
| Living room |
| Dining room |
| Bedroom |
| Bedroom - alternate view! |
| My wood paneling back on in the hallway. |
Friday, 27 January 2012
Getting on with downstairs!
We are finally getting things going downstairs! I have finished stripping the paint off the wood paneling downstairs and taken the rest to Buckie to get dipped. The insulation also arrived for downstairs so that's my job on Sunday! The taps have arrived for the bathroom and en-suite but we have no toilet or bath to put them on yet!
| Wood linings, 3 doors and 2 sets of shutter ready for the dippers! |
| A dusty hallway all stripped |
| Do you think I ordered enough?! At least we will be warm! |
Friday, 20 January 2012
Latest news
It's been a month since my last posting and we are getting on quite well! Michael has finished the pipework and tested it so it has no leaks! The plasterer has been in to tape the upstairs rooms and I have even tried out taping myself! We have a shower tray and have started to frame around that. I have also been stripping paint off the wood panels in the hallway - underneath the paint is varnish though and goes really sticky with the heat gun. The heat gun did keep my hands warm this week!
I had a lovely letter from Elma whose family owned the house for the 100 years before we bought it! It was full of info and photos of all the people who lived there throughout it's history. I will post some photos once I get them scanned.
| Bedroom taped nearly ready for painting |
| Stud wall in en-suite for shower |
| My first attempt at taping, Barry (the decorator) said it was ok for my first attempt! It is the cupboard so no-one will ever see it! |
| First layer of loft insulation - Michael is going up next time! |
| Panels partly stripped of paint and varnish |
Monday, 19 December 2011
Plumbing and framing downstairs
After a VERY chilly few weekends Michael has nearly finished the pipework for the radiators upstairs and plumbing in the bathroom and ensuite! The joiner has also been busy framing downstairs, I think it may be finished before Christmas after all!
![]() |
| Framing in the hallway through to bedroom |
![]() |
| How tidy does that pipework look?! |
![]() |
| The framing in the living room through the space for the double doors. |
Sunday, 13 November 2011
We are watertight!
The leaking roof is now fixed so we are wind and watertight ready for the winter! Michael and his dad were doing first fix of the pipework for the bathroom and en-suite yesterday. We need insurance for Alf; he had cut his finger within 5 mins of arriving then bashed his head on the car door coming back from the deli!
The joiner is in Cyprus (lucky him!) so downstairs hasn't moved on yet. We would like to have the framing finished by Christmas but that is only 6 weeks away!!!!!
Can anyone recommend a good plasterer in the Huntly/Keith/Buckie area?!
The joiner is in Cyprus (lucky him!) so downstairs hasn't moved on yet. We would like to have the framing finished by Christmas but that is only 6 weeks away!!!!!
Can anyone recommend a good plasterer in the Huntly/Keith/Buckie area?!
Friday, 21 October 2011
We have some rooms!
We now have one bedroom, bathroom and ensuite plasterboarded upstairs! Sorry about the photos, they were taken in the dark! We have knocked all the walls down downstairs now so it's looking very open-plan at the moment! At the house again tomorrow to finish off the cementing, pull out a million and one nails from the ceiling and start sanding down woodwork.
Louise and Graham were up the other weekend putting in the waste pipes for the bathroom and ensuite. They enjoyed a meal at the Crannach and local entertainment in the Three Kings!!
We now also have a roofer (after 2 months of looking) who hopefully will start this week, we will then be watertight, yay!
By the way let me know what you think of the new layout, I'm still not sure!
Louise and Graham were up the other weekend putting in the waste pipes for the bathroom and ensuite. They enjoyed a meal at the Crannach and local entertainment in the Three Kings!!
We now also have a roofer (after 2 months of looking) who hopefully will start this week, we will then be watertight, yay!
By the way let me know what you think of the new layout, I'm still not sure!
| Main bedroom |
| Into the en-suite |
| En-suite |
| The very last of the 100 year old wallpaper! |
| From dining room into bedroom - the wall facing will be a partition wall. |
| From the bedroom through to the dining then living room. |